What determines whether the assessment needs physical sampling?
The deciding factor is whether concealed condition could change the proposed option or quantity. Identify the question, suitable method and permission needed. Surface observations may establish a local detail repair while leaving a wider retained-layer decision unresolved. Keep that distinction in the scope so the team can authorize the investigation useful to its next decision.
Does an earlier condition report approve a new equipment opening?
The earlier report provides dated information about construction and findings. A new opening still requires review of its support, membrane connection and project requirements. Compare the alteration with current condition and applicable instructions. The report helps locate the interface; it does not replace design and coordination for work that was not part of that assessment.
How should the team use a report with inaccessible roof areas?
Retain those areas on the plan and state what was not examined. Identify the access or testing needed where the gap affects the proposed scope. Use confirmed findings for the decisions they support. A restricted visit should not create a roof-wide conclusion or conceal an outstanding question from the contractor pricing the work.
What should change after the recommended correction is completed?
Add the completion information to the original detail references, including material identification and any required follow-up. Record related trade tasks still open. The facility team can then see what was corrected and compare future findings at the same place. Closeout retains the report's history while making the current task status clear.